– n° 2 Codex 1200– n° 2 Gas modulating pressure jet burner– n° 2 Boiler control panel with eterm ® electronic board [...].
LIMONTA 1893 Innovazione e risparmio energetico ai massimi livelli Intervento di realizzazione nuovo impianto produttivo per la produzione di erba sintetica per campi da calcio. Il progetto T.I.B.A. S [...].
A prefabricated boiler room using with 5 ICI CALDAIE ASX 2500 hot water boilers was recently commissioned at the Grange Gorman Interim Energy Centre in Dublin. Thanks to a clever design by Alternative [...].
The challenge was to include into a new project designed from the grounds, a suitable diathermic oil boiler of high efficiency in order to answer to the needs of the customer. We succeeded to implemen [...].
The project consists of the installation of a thermal oil heat generator with over 2 MW of power. The production site is located in Estonia and uses diathermic oil for veneering and drying. The custom [...].