Home | Case Study | Manufacturing industry | Page 2
– n° 2 GREENOx.e 200– n° 2 Gas high/low progressive pressure jet burner low nox– n° 2 Boiler control panel with eterm ® electronic board [...].
– n° 1 GSX 2500 12 bar [...].
– n° 1 GSX 3000 12 bar– n° 1 ECO-G 4 (B) – GSX 3000– n° 1 GSS 72/1 – Comprehensive security system [...].
LIMONTA 1893 Innovazione e risparmio energetico ai massimi livelli Intervento di realizzazione nuovo impianto produttivo per la produzione di erba sintetica per campi da calcio. Il progetto T.I.B.A. S [...].
– n° 2 Codex 1200– n° 2 Gas modulating pressure jet burner– n° 2 Boiler control panel with eterm ® electronic board [...].
The project consists of the installation of a thermal oil heat generator with over 2 MW of power. The production site is located in Estonia and uses diathermic oil for veneering and drying. The custom [...].
– n° 2 GX 9000 15 bar export– n° 2 ECXV-I 90-100 (inox – tipo B) 9000000-10000000 kcal/h – GX 9000– n° 2 Modulating feed water system via electrically actuated valve D [...].
– n° 1 WHB 300 [...].
– n° 2 REX 400 [...].
– n° 1 SIXEN 800 12 bar export– n° 1 Atmospheric deaerator 500 LT [...].