Marelli Holdings Co., Ltd. (Rivalta)

Case Study

Detail

- n° 4 GREENOx BT COND 230
- n° 4 NEOX 325 M.MD.LR.IT.A.1.50.FA
- n° 1 Boiler control panel with eterm ® electronic board and etermWEBready
- n° 3 Boiler control panel with eterm ® electronic board
- n° 1 Temperature probe PT1000 (immersion probe for water heaters, mixed zone, solar panels, etc.)
- n° 4 Neutralizer

Boilers installed

Icona_condensazione

Three pass wet back condensing boiler able to produce hot water with a maximum temperature of 100°C., BAX...

Nominal power: 1000 ÷ 3000 kW

Design pressure: 5 bar

Efficiency: > 107,0 %

Methane gas burner of the modulating type suitable to satisfy the output required by the boiler to which...

Would you like to know more?