Carlsberg Italia

Case Study

Detail

The initial project involved the construction of a new boiler room for the Italian headquarters of multinational Carlsberg.
The goal was to provide a high-performance solution ensuring energy efficiency, operational continuity, and compliance with environmental regulations.


The solution


After a detailed analysis of system requirements, ICI Powering Evolution proposed a tailor-made configuration consisting of:
  • GX 10000 steam generator
  • ECXV 90-100 economizer, for heat recovery of 606 kW
  • GSS 72 system for up to 72 hours of autonomous operation without supervision
  • High-efficiency Weishaupt burner
  • Access ladder and walkway for maximum safety and accessibility


Achieved results


Thanks to collaboration with Carlsberg’s technical team and a shared design approach, it was possible to:
  • Significantly increase the overall system efficiency
  • Improve energy recovery while reducing consumption
  • Optimize management through the operator-free exemption system


Benefits obtained


Improved energy efficiency from day one
Optimized consumption and lower operating costs
Reduced emissions in compliance with environmental regulations
Certified safety and reduced need for continuous supervision

Boilers installed

GX

The GX range features outstanding monobloc steam generators, designed to give maximum reliability and durability. All models have...

Steam production: 1700 ÷ 32000 kg/h

Nominal power: 1163 ÷ 17442 kW

Design pressure: 12 or 15 bar

Efficiency: 90,0 %