Tarmeko – Wood Production Plant

Case Study

Détail

The project consists of the installation of a thermal oil heat generator with over 2 MW of power.
The production site is located in Estonia and uses diathermic oil for veneering and drying.
The customer started by using wood chips for production and using gas fuel both for a cogenerator and for the diathermic oil boiler.

Chaudières installées

It seems we can’t find what you’re looking for.

Voulez-vous en savoir plus?

Si vous avez besoin de plus d’informations, d’échantillons, d’un devis ou de conseils pour un projet, veuillez remplir le formulaire ci-dessous et nous serons heureux de vous aider.