Construction of a new plant to support the district heating system for the hospital and other areas of the city, providing an efficient and sustainable service.
ICI supported the plant operator in selecting the appropriate technology, ensuring maximum efficiency while taking into account the available space.

The district heating system operates with superheated water at 130°C, with a continuous network pressure of approximately 14 bar.
Four thermal units were selected, each with a capacity of 3,000 kW, for a total of 12,000 kW, which will supply hot water to the city of Mantua and the hospital.

Atmospheric emissions have been reduced to below 80 mg/Nm³ to ensure environmental compliance. In addition, the choice to use multiple generators in cascade will allow for flexible power management, expanding the available power range.


The benefits achieved:

Lower emissions
Optimized consumption and reduced operating costs

Boilers installed

Icona_acqua_surriscaldata

The ASGX EN range provides super-heated water boilers with three flue gas passes and completely wet furnace back....

Nominal power: 3000 ÷ 17000 kW

Design pressure: 12 bar

Efficiency: > 90.0%