Estover Piimatööstus OÜ — Cheese production

Исследование случая

Деталь

The client's initial request was substitution of an old steam boiler with very low efficiency and disturbed steam production.
Previously the plant was composed of a steam boiler with continuous surveillance of 6 t/h steam capacity which was working with a regular heavy oil burner  
After a careful analysis ICI Caldaie proposed a very efficient steam boiler GX 6000 (10 t/h) with a GSS 72 system to assure operation without supervision for 72h. The boiler was also equipped with a special economizer for heavy oil and double flue gas outlets. The second outlet will be used into the future when the boiler will run with biogas while the existing outlet is used for the regular use of heavy oil.