THE PROJECT
The project involved the modernization of the old existing coal-fired power plant with a new thermal power plant operating with a main fuel (methane gas) and a reserve fuel (diesel).

THE SOLUTION
2 steam boilers were supplied for a total production of 5 tons / h and 3 heat generators for a total power of 4 MW serving the heating and domestic hot water production systems.
The intervention included the design of the new power plant, the civil works, the assembly of the equipment and the modernization of the distribution networks.