THE PROJECT
The initial request of the customer involved the resolution of the problem of having a steam boiler destined for the research and development area, delocalised with respect to the primary steam distribution. The thermal power plant was built from scratch with a sandwich panel structure and positioned inside a GSX series steam boiler of 3 t / h producibility, equipped with a system for continuous operation without supervision up to 72 hours, economiser and other accessories to maximize performance

THE SOLUTION
After a careful comparison with the designer, a GSX 3000 series boiler was supplied which fully met the expectations and achieved the objectives sought in the delicate design phase: efficiency up to 95%, NOx atmospheric emissions below 100 mg / kWh and economy in management without the help of the ever present licensed driver.

Chaudières installées

GX

La gamme GX présente des générateurs de vapeur monobloc avec des performances excellentes, conçus pour offrir le maximum...

Production de vapeur: 1700 ÷ 32000 kg/h

Puissance utile: 1163 ÷ 17442 kW

Pression de conception: 12 ou 15 bar

Efficacité: 90,0 %